Overview
How a part moves through Silkline, from "I need a part" to "the part is at my dock" — requests, RFQs, quotes, orders, check-ins, and the master data underneath
Silkline gets parts to your dock as quickly, efficiently, and cheaply as possible. It handles everything from a simple buy of an existing part to sourcing a custom, outside-processed component.
Think of it as a procurement highway: many on-ramps and off-ramps, fast lanes where you want speed, and speed signs (checks like finance approval) where you need control.
The highway at a glance
Turn BOMs, build plans, and MRP runs into dated part needs.
Planners
Upload a spreadsheet, group lines straight into an order
Raise a hand: which parts, how many, and by when.
Engineers, stakeholders
Shop for COTS parts, import a part list
Chase updates until the part arrives and the PO closes.
Buyers, suppliers
Silkline suggests when to check in
You don't have to start at the beginning. Enter at any stage — starting earlier simply means more information carries forward automatically.
Table column help
Hover over an underlined column header, or focus it with the keyboard, to see its definitions. Status headers explain the available states; type, source, and result headers explain their values. In compact tables, you can also tap the header's info icon.
Legends are available for order confirmations, receipts, billing and payments, inventory types, supplier screening and document status, demand runs, evaluation step types, configurable fields, validation rules, user status, imports, sync results, and archived records.
Find your on-ramp
Procurement is a team sport. Not everyone travels the whole highway on every purchase.
Plans
For build-driven teams, demand starts with the plan, not a person. Plans turn what you're building into a list of dated part needs that buyers can act on.
Where demand comes from:
Your planning system. MRP runs sync in from an integrated planning system.
Build plans. Running a build plan against your BOMs creates demand for every part it needs.
Spreadsheets. Upload a CSV or Excel file. Silkline reads it with AI, so it needn't be perfectly formatted.
What you do with it:
Group demand into requests or orders. Each demand line is one need: a part, a quantity, and a need date.
Track coverage. Silkline shows how much of each need is already on a request or purchase order, and what's still uncovered.
Requests
An engineer says what's needed; a buyer picks it up and drives it forward. Requests are deliberately low-friction.
What a request needs:
A list of parts with quantities
A need-by date, when you have one. Without it, suppliers quote their standard lead time.
Optional: preferred suppliers (sourcing is the supply chain team's job), a justification, custom fields such as project or charge code, and design files like STEP files or drawings. Files attached here are shared securely with suppliers later during sourcing.
Fast lanes:
Shop for COTS parts. Open a retailer's website inside Silkline, shop as normal, pull the cart into Silkline, and turn it into a request. See Shop.
Import a part list. Upload a CSV of parts, like a BOM. Silkline uses AI to match your columns, so they don't need to be perfectly named.
Start from a quote. Already have a quote in Silkline? Create a request straight from it. See Ordering from quotes.
RFQs
Supplier conversations live in Silkline, not in your inbox. Send one RFQ to many suppliers and see who has responded at a glance.
Pre-send check. See when the part was last quoted or bought, and whether a still-valid quote already exists.
One click, many suppliers. Start from a template and send to multiple contacts across multiple suppliers at once.
Secure files. Drawings go out as encrypted links, not raw email attachments.
Engagement tracking. See when a supplier opens the email and downloads the files.
No supplier login. Suppliers reply by email; Silkline captures pricing and lead time.
Automatic no-bids. Declines move to a No Bid column, so you always know who is still outstanding.
Side-by-side comparison. A comparison grid lines up every supplier's quote and highlights the best cost and lead time.
Quotes
A quote adds the commercial detail — unit cost and lead time — for a specific supplier. Silkline reads it automatically, whatever format the supplier uses.
Any format in. Suppliers type numbers into an email reply or attach a quote document. Silkline reads both.
Forward to intake. A quote that lands in your own inbox can be forwarded to your organization's quote intake address.
Validity dates. A quote can carry an expiration date, so you can tell which quotes are still active.
Orders
Award a quote and cut a purchase order in a few clicks. The PO is where financial detail is added, and the anchor you track against until the part arrives.
Lifecycle: Draft (finalize details) → Approvals (departmental sign-off) → Open (released to the supplier). By default a buyer sends the approved order; it can also be set to send automatically on approval.
Built-in checks:
Supplier approval status. Orders can be blocked for suppliers you aren't approved to buy from. You wouldn't trust grandpa's old jalopy to make it cross-country, either.
Quality clauses. Clauses defined on a part appear on the PO PDF.
Terms and conditions. Every PO PDF includes Silkline's default terms or ones specific to the supplier.
Tracking after it's sent:
ETA. Calculated automatically from the quoted lead time, like your GPS's first estimate before you leave the driveway.
Order confirmations. Silkline reads the supplier's confirmation and flags a wrong SKU, wrong quantity, or missing confirmation.
Supplier documents. Certificates of Conformance, FAI reports, and other documents are stored on the PO.
Learn more about Orders → · Approvals →
Check-ins
Ask "are we there yet?" without the 40-message email thread. A check-in asks for updates on specific open lines, and every answer lands on the order.
When: send one any time, or follow Silkline's suggestions. It flags suppliers with lines past their need date, ETAs within the next three weeks, or no check-in in over a month.
Through a check-in, suppliers can:
Update the ETA
Move the line through status stages, such as being prepared or in transit
Leave notes on progress
Attach photos, inspection records, and tracking numbers
Everything flows through the same encrypted channel as the rest of Silkline.
End of the road: received and billed quantities are tracked against the order, in Silkline or an external system. Once fully reconciled, the PO moves to Closed. You have arrived.
Learn more about Check-ins → · Track receipts →
Cars and cargo: suppliers and parts
Every journey has a driver, a car, and cargo. Buyers are the "drivers," suppliers are the "cars" that bring parts to your dock, and parts are the "cargo." Create suppliers and parts as you go, bulk-load them upfront, or sync them from another system through Integrations.
Suppliers
A supplier name plus the contacts Silkline sends RFQs and orders to.
Approval status — in evaluation, restricted, or approved
Denied party screening — scheduled checks against government lists, like making sure a car isn't reported stolen before you get in
Scorecards — a driving record built from on-time delivery and quality in your purchase history
Evaluations — onboarding, NDAs, and expiration dates in one place
Parts
Usually synced from a PLM tool.
Part numbers and revisions
Categories for grouping
Quality clauses — requirements a supplier must meet for the part. Think of it as "special handling," the way ice cream needs a refrigerated truck
Supplier part numbers — each supplier's name for the part, tied to your own number
Inventory type — Inventory, Non-Inventory, or Non-Receivable (such as services)
Last updated
Was this helpful?