Work demand lines from your planning system, group them into requests and orders, and track how much of each need is covered

Demand is where a planner works with the parts and quantities a plan requires. Each line states one need: buy this quantity of this part by this date. Planners can group demand lines into requests and purchase orders. Silkline records the quantity linked to each request or order as coverage.

Demand belongs to the Plans module, which is under active development and must be turned on by an administrator. See Enabling Demand.

Key concepts

Concept
Description

Demand line

One procurement need: a quantity of a part wanted by a date. A planner can group it with other demand lines in a request or order.

Run

The planning pass that stated the line: an MRP run ingested from your planning system, a build plan run, or a manual run uploaded from a file. A run's lines appear together on its run page.

Coverage

The quantity of a demand line allocated to a request line or purchase line. One demand line can be split across several lines, and one request or purchase line can cover several demand lines.

Segment

A field that splits coverage, such as a Project configurable field or the built-in Need date. A request or purchase line counts toward demand only when every segment value matches. See Coverage Segmentation.

Enabling Demand

An administrator turns the module on under Organization Settings → Plans → Enable Plans. Until it is on, the Demand pages show Demand Not Enabled. Once on, Demand appears in the navigation, marked as beta. The same settings group holds Coverage Segmentation and Demand Item Fields, the custom fields available on demand lines.

Lead times

Silkline tracks two lead times, both in calendar days:

  • Vendor lead time - from placing an order to the part arriving. A demand line's Order By date is its need date minus this.

  • Procurement lead time - sourcing the part before the order is placed, such as quoting and approval. A demand line's Start By date is its order-by date minus this.

Set organization defaults under Organization Settings → Parts → Lead Times. Changing them needs the Edit Organization Settings permission. Enter a whole number of days; 0 means same day. A blank default leaves parts without that lead time unless the part or its category sets one.

Parts and categories can carry their own values. For each lead time, Silkline uses the part's value, then the value on the part's category or the nearest category above it, then the organization default. Set Vendor Lead Time (days) and Procurement Lead Time (days) when you create or edit a part; editing a part needs the Edit Part permission. Clear a field to return the part to what it inherits. A new revision starts with the previous revision's values. The part page shows each lead time in use and, when it is inherited, where it comes from.

Where demand comes from

Your planning system

A planning system integration can import purchasing requirements as demand lines and group them into demand runs. Imported lines can include the part, quantity, need date, buyer, suggested supplier, status, and custom fields. Each line's detail page links back to its record in the source system.

Manufacturo is currently the only supported planning system integration. See Manufacturo for connection and configuration details.

You cannot create or delete a demand line that an integration owns.

Build plans

When BOMs and Build Plans is enabled alongside Plans, running a build plan creates a plan run whose lines land in the same table. A plan run's page links back to the build plan that produced it.

Uploaded files

Choose Upload demand on the Demand page to load demand from a file. Silkline accepts CSV, XLS, and XLSX files. A spreadsheet in the upload format is read as written, and every line it holds appears in a preview. Nothing is written until you confirm.

  • Workbooks - only the first sheet of an XLS or XLSX file is read. The preview names the other sheets in a warning.

  • Size - an upload holds at most 5,000 lines. The preview says when a file has more, and the upload cannot be applied.

File format

Download template gives a CSV in the upload format. The header row is the first row, within the first 20 non-empty rows, that names Part Number, Quantity, and Need Date. Rows above it are ignored, and each row below it is one line. Column names match regardless of case, spaces, and punctuation.

Column
Required
Also accepted
Notes

Part Number

Yes

Part, Part No, Item Number

Quantity

Yes

Qty

A number greater than zero, with a period as the decimal separator. CSV values such as 1,5 or 1,250 produce a row error; correct them in the file.

Need Date

Yes

Need By Date, Need By, Due Date, Required Date

Write dates as YYYY-MM-DD. A date like 06/01/2026 reads month first, unless another date in the file only reads day first, like 25/06/2026.

Revision

No

Rev

Description

No

Part Description

Describes a part that is not in your parts library.

Supplier

No

Suppliers, Vendor

Separate several suppliers with a semicolon.

Line ID

No

Identifies the line across versions of a run. See Upload a new version of a run.

Add one column for each demand line custom field, named as the field. When a field shares a name with a standard column, the standard column is read. The preview shows a column for each custom field the file fills, with the value the upload writes.

  • Columns with other names, and a second column for the same field, are not read. The preview lists them.

  • Rows with no quantity and no need date, such as notes or section headings, produce no line. Total rows are skipped.

The upload also names the row when a CSV contains malformed quotes.

Read a file with AI

A spreadsheet whose header row is missing a required column is not read in the upload format, and the upload names the missing columns. Neither is a spreadsheet where no row has a part number with a quantity or need date. Choose Read with AI to have Silkline find the columns instead. AI reading also handles other layouts, such as a part number column with one quantity column per date. Check every line in the preview before you apply a file read with AI.

Under Upload to, choose Create a new run and name it, or Update an existing run to load a newer version of a manual run. A new run's name starts as the file name.

How parts and suppliers are matched

  • Part - the part number is matched to your parts library as written, or as a part number and revision. For example, a line for revision A of ACME-100 matches that revision in the library, whether the file gives the revision in its own column or as part of the part number. A line whose part is not in the library is saved as a custom part, described by the file's description.

  • Supplier - the line's supplier hint is set only when the supplier names on the line match exactly one of your suppliers. Names match regardless of case, punctuation, and legal suffixes, so Acme matches Acme Inc. A line that names several suppliers, or a name that matches none or more than one, leaves the supplier blank. The preview still shows the names. When a new version of a run is uploaded, a line keeps the supplier it already has unless the file's names match exactly one supplier.

Create missing parts, suppliers, and options

When a file names parts, suppliers, or select-field values that Silkline does not have, the preview lists them under Not in Silkline yet, one entry per value however many rows use it. Create them from the preview before you apply the upload:

  • From a row - choose Create part, Create rev B, Create next to a supplier name, or Add "value" to Field next to an unknown option. Every row that uses the value is matched to the new record.

  • In bulk - choose Review for parts, suppliers, or field values, pick which to create, and confirm. Select a whole group at once, such as New revisions or one field's values.

Records are created when you confirm, for your whole organization, and stay even if you discard the upload. A part number already in your library is linked instead of created again. A new part takes the file's part number, revision, and description; a new supplier takes only its name. Rows that a new option makes valid are added instead of skipped.

Quick-create follows your permissions and settings:

  • Creating parts needs the Create Part permission, creating suppliers needs Create Supplier, and adding options needs Edit Configurable Field Definition.

  • When your organization manages parts or suppliers through an integration, create them in that system instead.

  • When new suppliers require a contact or a country, create them on the Suppliers page.

  • A field whose options are managed by a linked integration cannot get new options.

A value that matches more than one record, such as a supplier name shared by two suppliers, is listed but not created.

Rows with errors

The preview marks each row it cannot use and says why: a missing part number, a missing or non-positive quantity, a missing or unreadable need date, or a custom field value that does not fit its field. A new run skips those rows and adds the rest. A file with row errors cannot update a run: fix the rows and upload the file again.

The preview also lists the rows of the file that produced no line, such as notes or section headings, so you can check that no demand is missing.

Upload a new version of a run

Choose Upload new version from a manual run's action menu, or Update an existing run in the upload, and pick the run. Silkline matches each file row to a run line by its exact line identity:

  • A Line ID identifies a line when the file provides one. Otherwise, the identity combines part number, need date, and supplier.

  • A line with the same identity is updated in place when its values change.

  • A line with a new identity is added when it does not require manual review.

  • An open, uncovered line missing from the file is cancelled.

  • A cancelled line that appears in the file again reopens.

  • A closed line stays closed. Its values still update, and it is not cancelled.

  • A line added to the run by hand is neither matched nor cancelled by an upload.

  • Coverage stays attached to a matched line. A covered line cannot be cancelled by an upload.

The confirm button counts the adds, changes, and cancels before you apply them. Next to the cancel count, the preview shows how many rows of the file produced no line; hover it to see their row numbers. When the upload cancels lines, check I understand N open lines will be cancelled before you apply.

Work your queue

Demand opens on seven tabs. All shows every line in any status, and Closed & Cancelled shows the lines worked to done. Every other tab is a queue over open lines that empties as the work completes. Each tab but All has a count badge matching its scope. Each tab keeps its own filters, sort, and columns.

  • Needs Coverage - open lines whose requests and orders cover less than the needed quantity. Put them on a request or order. The Coverage column tells not covered from partially covered lines.

  • Needs Sourcing - open lines with no confirmed, unexpired quote naming the part. These need an RFQ before they can be ordered. Custom parts land here.

  • In Work - open lines on a request that is not yet ordered (Requested, Out for quote, or Quoted), or on an order still in Draft, Review, or Approved. Send the RFQ, follow up on quotes, or get the order approved and sent. A partially covered line can appear here and in Needs Coverage at once.

  • Unassigned - open lines with no buyer. Distribute from here.

  • My Queue - open lines assigned to you.

  • Closed & Cancelled - lines that are closed or cancelled, which every queue above leaves out.

Needs Coverage, Needs Sourcing, Unassigned, My Queue, and Closed & Cancelled show the filter they always apply as a chip marked with a lock above the table: Coverage, Quote Coverage, Buyer, or Status. A locked filter cannot be edited or removed, and it is not listed under Filters. Any filter you add narrows the tab further. Updating a saved view on a locked tab preserves its saved selection for the locked filter; that selection applies on tabs where the filter is unlocked.

Each tab sorts by the date its work is due against, earliest first: Needs Coverage, Needs Sourcing, Unassigned and My Queue by Start By, In Work by Order By, and All and Closed & Cancelled by Need Date. Group by Buyer, Part, Source, or any other dimension to carve the queue up, and save the arrangement as a view. Each group header shows its line count in a badge beside the group name. Grouping by Part gives each revision its own group, labeled with the part number and revision.

See which lines to start and order

Each line shows two dates beside its Need Date:

  • Start By - the last day to start sourcing: the order-by date minus the procurement lead time.

  • Order By - the last day to place the order: the need date minus the vendor lead time.

A date that has passed shows in red, and one within 7 days shows in amber, until the line reaches that step: Start By until the line is requested, Order By until it is on order. After that the date shows in gray. Hover a date to see the line's start, order and need dates on a timeline with today marked and the lead time between each.

Needs Sourcing shows Start By only, In Work shows Order By only, and Closed & Cancelled shows neither; turn them on from the column selector. Lines without the sorted date sort last.

A line with no need date reads No need date. A line with no vendor lead time, or no procurement lead time, says so in place of the date it cannot compute.

Filter Urgency to Late to order, Late to start, Due within 7 days, On track, No need date or No vendor lead time. A line that is late to order is not also counted as late to start.

See a line's schedule

The Schedule card at the top of a demand line shows Start sourcing, Place order and Needed in order, with the lead time between each and where it comes from: Set on part, a category, or Org default.

Each step also shows how far the line has got. A request covering the line ticks off Start sourcing, an order ticks off Place order, and receiving it ticks off Needed. A step covered only in part reads, for example, 6 of 15 ordered, and the request or order numbers follow. Retracted coverage and cancelled orders do not count.

A line keeps the lead times it had when it was created. When the part's current lead time differs and the step it schedules is not done yet, the card says so and what the new dates would be, such as PN-1042's vendor lead time is now 42 days, which would move Order by to 11/18 and Start by to 11/8. Choose the Use button, such as Use 42 days, to adopt the part's current lead times; this needs the Edit demand permission. Re-syncing from your planning system does not change a line's lead times.

Assign buyers

Select unassigned lines and choose Assign buyers. Silkline proposes a buyer per line from rules applied in priority order: Category manager, then Supplier owner, then Last part buyer, then Chosen buyer, a person you pick for whatever the rules did not match. Only Category manager is on by default. Review the proposals before applying them. A re-sync from your planning system restates the buyer from the source, so assignments made here hold only until the source names someone else.

Correct a quantity

When the run's figure is wrong, set an Asserted quantity on the line rather than editing upstream. Coverage is measured against the asserted quantity, the Coverage cell marks it with a dotted underline, and a re-sync preserves it. An asserted quantity can be changed but not cleared once set.

A planner can edit Asserted quantity, Need date, Buyer, and Pedigree inline on the line or with Bulk edit across a selection. Bulk edit also sets Part / revision. Fields left blank in a bulk edit keep their existing values; the field reads Mixed where the selection disagrees. Need date and buyer can be cleared from the detail page. Custom fields are editable unless the field definition is read-only, as fields an integration populates are. Everything else follows the run.

Correct the part or revision

When a line names the wrong part, or an upload matched the wrong revision, pick the right one under Part number on the line's detail page, or with Part / revision in Bulk edit. Each revision is listed separately, and Revision follows the part you pick. A part can be changed but not cleared.

Coverage from a request or order line for a different part is retracted: Silkline asks before saving, the line reopens by that quantity, and the allocation stays on the line as history. Coverage whose request or order line already names the new part is kept. Lines from your planning system keep their part, because the next re-sync restates it; correct those in the source.

Set pedigree in bulk

Choose Pedigree in Bulk edit to set it on every selected line. When your organization restricts pedigrees per material, a line whose part does not allow its pedigree is marked Ineligible Material, as an order line is. On a single line, the picker greys out pedigrees the part does not allow, and still accepts them. A custom-part line accepts any pedigree.

Bulk actions can address every row matching your current filter, including pages you have not opened.

Source parts that have no quote

The Sourcing column reads Has quote when a confirmed, unexpired quote on file names the part, and No quote when none does. It describes the part, not the line, so a closed line can still show either value. It is read live from your quotes, so a quote lapsing moves a line on the day it expires. Quoting Suppliers lists who has quoted the part, dimming a quote whose break quantity exceeds the line's open quantity. Last Supplier shows the most recent open or closed order for the part; draft, review, approved, and cancelled orders do not count. Create a request from the line to run the RFQ.

Create requests and orders from demand

Create a request or order from a demand line's detail page, a table selection, or all open lines in a demand run.

1

Select the demand you want to buy

Tick lines on the table, or open a single line. The buttons are disabled for a line with no open quantity.

2

Choose Create request or Create order

On a line's detail page, Create order is in the menu beside Create request. The takeover opens headed New request from demand or New order from demand, with a subtitle counting the request or purchase lines and the demand lines they came from.

3

Review what was preloaded

Selected demand lines become one request or purchase line when they share a part, a pedigree, and every segment value, with need dates falling in the same Need date bin. Their open quantities add together, and the line takes the earliest date. The bin starts at Day and can be widened under Coverage Segmentation. A request gets a description naming the runs, a header need date from the earliest line, and one part row per grouped line. An order gets one purchase line for each group and takes the supplier hint only when every demand line in the group agrees on one. Otherwise, the supplier stays blank. Cost and delivery stay blank because demand states a need, not terms.

Lines already fully covered, or closed or cancelled, are left out, and the takeover names each with its reason. Add anyway pulls them in at their full demanded quantity and rebuilds the form, so use it before you start editing.

4

Edit and save the record as normal

The takeover hosts the ordinary create form. Requester, buyer, followers, tags, suppliers, and costs work exactly as on a hand-written request or order.

5

Silkline writes the coverage

After the save, Silkline reads back the lines you kept and pegs coverage to them. A saved line covers a demand line when the part matches exactly and every segment value matches. The most urgent unclaimed demand is covered first, capped at what was planned. A line you dropped leaves its demand uncovered; a line you added covers nothing. A line whose need date you moved later or cleared still covers its demand, and the summary flags it as needed after the demand's need date.

The takeover then shows a coverage summary. It counts the selected demand lines that are covered, partially covered, not covered, or covered after their need date, and notes any created lines that matched no demand. Below the counts, the demand lines are grouped as Not covered, Partially covered, and Covered, and each line shows its covered quantity and the reason it stayed open. Choose Open request or Open order to go to the record, or Done to return to demand.

You can create a request or order from up to 500 demand lines at a time. Above that, narrow the selection and try again.

Coverage transferred from a request

Linking an order to a request moves the request's coverage onto the order's lines automatically, apportioned in proportion to their quantities and capped at what each line buys. Only a line still buying the part the request asked for qualifies, and segment values must match. On the demand line, the coverage row moves from On request to On order with no action from you.

Coverage that no order line qualifies for stays on the request line. The order's About this Order still lists that demand under Related Demand, without the option to retract it there.

When a request or order for the part already exists, link it to the demand instead of creating a new one. This includes orders raised outside Silkline, such as purchase orders synced from an ERP. On a demand line's detail page, open the menu beside Create request and choose Link existing to open Link existing supply. The option is available with Edit demand permission when the line has open quantity.

The dialog lists the lines that can cover the demand:

  • Requests - open requests that carry the same part.

  • Orders - orders in Draft, Review, Approved, or Open that carry the same part, on lines that are not closed.

  • Custom parts - a custom part matches by description.

A line is left out when this demand already covers it, when it has no quantity left, or when its other segment values, such as program or project, do not match the demand.

Each row shows the supply document with a link, the supplier, the state, the supply date, the quantity, the quantity allocated elsewhere, and the remaining quantity. A pill beside the date reads On time, N days late, or Undated. Lines dated more than 90 days before or 14 days after the demand's need date are hidden. Undated lines always show. Choose Show all dates to reveal the hidden lines.

When the demand line has a pedigree, lines whose pedigree meets it come first: the same pedigree, or one approved for it in your pedigree settings. The rest still show, marked Pedigree doesn't meet demand. Linking one of them asks you to confirm with Link anyway, or choose Back to keep your selection and pick again.

The Link existing supply dialog with an Aerospace Grade line listed first and a line without a pedigree marked Pedigree doesn't meet demand, selected, with the Link anyway warning shown
A line whose pedigree doesn't meet the demand asks before linking
The Link existing supply dialog listing an on-time order line and an undated request line, with one row selected and the quantity set to the open demand
Pick a supply line and set the quantity to link

Pick one line and set a quantity. The quantity starts at, and is capped at, the smaller of the demand's open quantity and what the supply line has left. Choose Link supply to record the coverage. It appears on the line's Coverage card, and the request or order itself is unchanged.

If someone else uses up the supply line or covers the demand first, Silkline refuses the action and writes nothing. Reopen the dialog to see the current quantities.

When a request already covers a batch of demand, select the lines on the table and choose Link to request. The dialog lists open requests with a line that can cover at least one selected line, under the same rules as Link existing, and reads Covers N of M lines for each. Requests covering the most lines come first.

Pick a request to link each selected line to its matching request line, up to that line's remaining quantity. Lines sharing a request line take its quantity in need-date order. The request itself is unchanged, including one already sent to suppliers. The toast counts the lines linked and the lines that had no matching line with quantity left.

Confirm what is covered

The Coverage cell shows a coverage status icon, covered against demanded quantity, and a stacked bar ordered from received to requested. Hover the icon to read the status. Select the bar to see the covered and open quantities, the status, and a chip linking to each covering request and order.

Coverage status
Meaning

Not covered

No request or order covers this line yet.

Partially covered

Part of the quantity is covered; the rest still needs buying.

Covered

Requests or orders cover the full quantity.

Surplus

Coverage beyond the needed quantity; the excess can be retracted. The cell shows the Covered check with +N after the quantity, and a dark mark on the bar shows where the needed quantity ends.

The table and the line's Coverage card describe the same allocations at different grain. An allocation reports as its order line once one exists, because the order line is the one actually buying the demand.

Allocation
Table bucket
Coverage card stage

Request line, no order yet

Open request

On request

Request line on a cancelled request, no order yet

Not counted as covered

Cancelled request

Purchase line, not fully received

Open order

On order

Purchase line, complete or over received

Received

Received

Purchase line on a cancelled order

Received for units already received; the rest is not counted as covered

Cancelled order, or Received when the line was fully received

Cancelling a request or an order reopens the demand it no longer delivers. Reopening it restores its coverage. An order raised from a cancelled request still covers the demand.

Each card row names the covering record, the stage, the quantity, who created the covering record, and when the coverage was attached. Retracted rows sit under a Retracted heading with the quantity struck through.

History on a line opens Line Activity, which records the line's creation and every coverage attach and retraction. Field edits are not recorded.

Undo coverage

Retraction takes an allocation back so it no longer counts. It is a correction, not a record of fulfilment: a received order keeps its allocation and reports delivery through the order line. Retract from the line's Coverage card with Retract on the row, or from the linked demand on a request's or order's detail page, which retracts every allocation tying that document to the line at once. The demand becomes open again and the allocation stays as history, excluded from covered quantity, the coverage bar, run rollups, and search.

Close out demand

Status says whether the run still demands the line. It is distinct from coverage, which says whether the need has been met.

Status
Meaning

Open

The run still demands this line.

Closed

The line is finished: the need was met, or a later run restated it.

Cancelled

The line was withdrawn and is no longer demanded.

Change status from the selector beside a line's title, with Close lines and Cancel lines on a table selection, or with Close all lines and Cancel all lines on a run. A closed line cannot move straight to cancelled, or the reverse: reopen it first. Changing status leaves coverage in place.

Demand runs

A run's page gathers everything one planning pass asked for. Open it from the Source column on any line, or, for an uploaded run, from Runs on the Demand page. Runs lists every uploaded run, newest first, with its upload date, line count, and coverage status. A run page shows the run type, a coverage rollup, a progress banner with the share of open demand covered, and how many request and order lines are allocated to it. From the action bar, you can create a request or order, assign buyers, close lines, or cancel lines for all open demand in the run. On a manual run, Upload new version updates the run from a newer file. You can rename any run.

Why does this line...

...show a blank Coverage cell? Coverage status applies to open lines only. Closing or cancelling a line blanks the cell. The coverage itself stays attached, and the status returns when the line is reopened.

...still show coverage after its order was cancelled? A cancelled order still counts the units it received. The rest of its line shows a Cancelled order stage on the Coverage card and is not counted. Retract the coverage to remove it from the card.

...stay open after I created a request or order? No saved line matched it. The toast names the likely causes: the part changed in the form, or a segment value differs. The request or order is already saved at that point, so fix it there or retract the coverage and try again.

...show a quantity the run did not ask for? A planner set an Asserted Qty. Coverage is measured against it, and Demanded Qty shows whichever figure is in force.

...lose the buyer I assigned? A re-sync from your planning system restates buyer, part, need date, pedigree, status, and supplier hint from the source. Only the asserted quantity survives.

...disagree between Ever Purchased From and Last Supplier? The filter spans the whole purchase history; the column shows only the most recent purchase.

Reference

Columns worth knowing

Most columns are self-explanatory. These carry meaning that is not obvious from the header. Many are hidden by default and available from the column selector.

Column
What it shows

Description

The part's description, or the line's custom part description when it has no linked part. Always included in CSV export.

Line No.

The source document's own name where it has one, otherwise the line's position within it.

Run Qty

The gross quantity the run asks for, in the part's consumption unit of measure.

Asserted Qty

The quantity a planner set, overriding the run.

Demanded Qty

The quantity coverage is measured against: asserted when set, otherwise run.

Open Qty

Demanded less covered, floored at zero. Zero for any line that is not open.

Supplier Hint

The supplier the source suggests. Advisory only: it does not commit the line. An order created from demand lines that all share one hint starts with that supplier.

Source

The run that stated the line, linking to the run page.

Sourcing

Has quote or No quote, read live from your quotes for the part.

Last Supplier

The supplier on the most recent open or closed order for the part.

Quoting Suppliers

Suppliers with a confirmed, unexpired quote for the part.

Segment columns are shown by default and marked with a branch icon carrying a Manage segments link. Each demand line custom field is its own column.

Search demand... matches line number, part number, name, and description, custom part description, category, run name, and the numbers of covering requests and orders. Filters cover Status, Coverage, Quote Coverage, Ever Purchased From, Quoting Suppliers, Supplier Hint, Source, Buyer (with Unassigned), Part (with Custom part), Category, Inventory Type, Need Date (with Due in next), Created (with Older than), and every demand line custom field. Segmentation fields sort to the front.

Permissions

To do this
You need

See the Demand pages

The Plans module enabled for your organization.

Edit a line, change its status, run bulk actions, retract coverage, rename a run

Edit demand.

Upload a file as a new manual run

Create demand.

Upload a new version of a manual run

Create demand and Edit demand.

Link existing supply to a line, or link lines to a request

Edit demand.

Create a request from demand

Edit demand and Create request.

Create an order from demand

Edit demand and Create order.

Enable the Plans module and manage segmentation

Silkline administrator permissions.